PRIMAVERA Project Management Version 6.0
PRIMAVERA Project Management Version 6.0
Jakarta | 12 – 13 Januari 2010 (Duration : 2 Days)| Rp 3.500.000,-
- Jakarta | 16 – 17 Maret 2010 (Duration : 2 Days) | Rp 3.500.000,-
- Jakarta | 18 – 19 Mei 2010 (Duration : 2 Days) | Rp 3.500.000,-
- Jakarta | 14 – 15 Juli 2010 (Duration : 2 Days) | Rp 3.500.000,-
- Jakarta | 22 – 23 September 2010 (Duration : 2 Days) | Rp 3.500.000,-
- Jakarta | 24 – 25 November 2010 (Duration : 2 Days) | Rp 3.500.000,-
CURRICULLUM
Introduction to Project Management Concepts
- Project Management Processes
- CPM Concept
Organizational Breakdown Structure (OBS) & Enterprise Project Structure (EPS)
- Create Views
- Different Views
- Difference between OBS & EPS
Project
- Overview of the Project
- Create New Project through Detail or Wizard
Calendar
- Define New Calendar
- Modification Holiday of Calendar
- Making Project & Resource Calendar
- Assigning New Calendar as default for the Project
- Applying Different Calendar to the Activities
- Define Calendar for Working Days and Calendar Days
Column
- Entering Activity through Details or Wizard
- Inserting a New Column
- Moving the Column
- Time Scale Adjustments
Relationship
- Define Relationship of the Activity
- Difference kind Relationship between Tasks
- Difference Method of Linking
- Editing the Task Link
Critical Path
- Identifying the Project Critical Path
Project Date
- Estimating the Project Finish Date
Constraint
- Constraint in a Project
- Different Types of Constraint
- Applying Constraint to the Activity
Work Breakdown Structure (WBS)
- Defining of WBS Structure
- Applying WBS for the Task
Activity Codes
- Defining and Assigning Codes
- Organizing and Reorganizing Codes
Roles
- Importance of Roles
- Defining the Roles and Giving Rates for the Rules
Resource
- Defining Resource through Detail or Wizard
- Defining Resource through Calendar
- Create New Unit for Materials which are not available in the list
- Resource Assigning through Add Roles
- Resource Assigning through Add Resource
- Giving Difference Rate Which has not mentioned either in Resource or Role
- Resource Analysis
- Resource Usage Profile
- Resource Usage Spread Sheet
- Resource Curve
- Resource Leveling
Leveling
- Automatic Leveling
Updating Progress
- Setting Data Base
- Entering Actual Start & Actual Finish Date for Tasks
- Updating through Duration
- Updating Through Physical Percent Complete
- Updating through Unit
- Updating Cost
- Comparative Study of Baseline and Actual Plan
Earn Value
- Earned Value Concept
- Calculating Earn Value Analysis
Filter
Report
Tabular
Graphical
Import & Export
Formatting Bars
Global Change
Instruktur
Aldrin Asnil, MT
Berlatar pendidikan Magister Teknik Sipil (Konstruksi) , Beliau berpengalaman lebih dari 15 tahun sebagai Engineer dan Senior Primavera Praktisi dan Instrukstur pada perusahaaan Konstruksi Nasional dan Multinasional serta pernah menangani puluhan proyek berskala besar. Di antaranya:
- Power Plant 600 MW, Cirebon
- Pesantren, Ruko, Masjid Al-Lathif, Bandung
- Gandaria Main Street Super Blok, Jakarta
- Fluor Mill Factory, Cilegon
- Mill Shoe Factory, Tanggerang
- OBE Factory Outlet, Tanggerang
- Sanex Industrial Building, Tanggerang
- RSUD Cibubur, Cibubur
- Gedung PLN Sunter, Jakarta
- Workshop Extension Building
- JITC, Jakarta Residence, Jakarta
- Mall Panakukang Mas, Ujung Pandang
- Ungasan Resort, Bali
- Wisma Mentari (24 Lt), Jakarta
- Borobudur Hotel International Development, Jakarta
- Perkulakan Goro Development, Jakarta Rawamangun
- Golf Site Development, Jakarta
- Lawry’s Restaurant Construction, Jakarta
PRIMAVERA
SILABUS :
- Pengantar Manajemen Proyek Konstruksi.
- Pengantar Lingkup Kerja Primavera.
- Konsep dan Teknik Critical Path Methode (CPM).
- Membuka Proyek Terdahulu (Opening an Existing Project).
- Memulai Primavera Project Manager (Starting Project).
- Mendefinisikan Enterprise Project Structure (EPS).
- Mendefinisikan Organizational Breakdown Structure (OBS).
- Membuat dan Mendefinisikan Layout Proyek Aktivitas.
- Customize Lembar Kerja (Column Display, Hide & Modify).
- Merencanakan Proyek Baru (Create a New Project)).
- Mendefinisikan Work Breakdown Structure ( Define WBS).
- Mendefinisikan Tipe Aktivitas (Define Activity).
- Mendefinisikan Hubungan antar Aktivitas (Define Relationship).
- Mendefinisikan dan Menentukan Kalender (Define and Assign Calendar).
- Mendefinisikan dan Menentukan Durasi (Define and Assign Duration).
- Mendefinisikan Batasan Proyek (Define Constraints).
- Mendefinisikan dan Menentukan Resource (Define and Assign Resources).
- Mendefinisikan dan Menentukan Resource Skill (Define and Assign Roles)
- Meratakan Distribusi Penempatan Resource (Levelling).
- Mengupdate Schedule dan Perkembangan Proyek (Updating Progress).
- Mendefinisikan Konsep dan Metode Earned Value
- Pengelolaan Proyek berdasarkan Earned Value.
- Analisa Proyek berdasarkan Resource Usage Profil.
- Analisa Proyek berdasarkan Resource Usage Spread Sheet.
- Analisa Proyek berdasarkan Activity Usage Profil.
- Analisa Proyek berdasarkan Activity Usage Spread Sheet.
- Analisa Proyek berdasarkan berdasarkan Resource Profil (S-Curve).
- Menyajikan Kurva Perkembangan Proyek.
- Membuat dan Mendefinisikan Proyek Baseline.
- Membandingkan Baseline dan Actual Plan.
- Mendefinisikan Formatting Bar dan Filter.
- Melakukan Import & Export.
- Menyajikan Laporan Proyek (Project Report).
Jadwal Materi Training Primavera P6
HARI | JAM | MATERI | SUB MATERI | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1
2
| 09.00-09.30
09.30-10.00
10.00-12.00
13.00-13.15
13.15-16.00
09.00-11.30
11.30-12.00
13.00-16.00 |
Photo session and Assestment |
|